CQI (channel quality indicator)
CQI is an indication of the downlink mobile radio channel quality as experienced by this UE. Essentially, the UE is proposing to the eNodeB an optimum modulation scheme and coding rate to use for a given radio link quality, so that the resulting transport block error rate would not exceed 10%. 16 combinations of modulation scheme and coding rate are specified as possible CQI values. The UE may report different types of CQI. A so-called “wideband CQI” refers to the complete system bandwidth. Alternatively, the UE may evaluate a “sub-band CQI”
value per sub-band of a certain number of resource blocks which is configured by higher layers. The full set of sub-bands would cover the entire system bandwidth. In case of spatial multiplexing, a CQI per code word needs to be reported.
The time and frequency resources used by the UE to report CQI are under the control of the eNB. CQI reporting can be
either periodic or aperiodic. A UE can be configured to have both periodic and aperiodic reporting at the same time. In
case both periodic and aperiodic reporting occurs in the same subframe, only the aperiodic report is transmitted in that
subframe.
For efficient support of localized, distributed and MIMO transmissions, E-UTRA supports three types of CQI reporting:
- Wideband type: providing channel quality information of entire system bandwidth of the cell;
- Multi-band type: providing channel quality information of some subset(s) of system bandwidth of the cell;
- MIMO type: open loop or closed loop operation (with or without PMI feedback).
Periodic CQI reporting is defined by the following characteristics:
- When the UE is allocated PUSCH resources in a subframe where a periodic CQI report is configured to be sent, the periodic CQI report is transmitted together with uplink data on the PUSCH. Otherwise, the periodic CQI reports are sent on the PUCCH.
Aperiodic CQI reporting is defined by the following characteristics:
- The report is scheduled by the eNB via the PDCCH;
- Transmitted together with uplink data on PUSCH.
When a CQI report is transmitted together with uplink data on PUSCH, it is multiplexed with the transport block by L1
(i.e. the CQI report is not part of the uplink the transport block).The eNB configures a set of sizes and formats of the reports. Size and format of the report depends on whether it is transmitted over PUCCH or PUSCH and whether it is a periodic or aperiodic CQI report.
PMI (precoding matrix indicator)
PMI is an indication of the optimum precoding matrix to be used in the base station for a given radio
condition. The PMI value refers to the codebook table. The network configures the number of resource blocks that are represented by a PMI report. Thus to cover the full bandwidth, multiple PMI reports may be needed. PMI reports are needed for closed loop spatial multiplexing, multi-user MIMO and
closed-loop rank 1 precoding MIMO modes.
RI (rank indication)
RI is the number of useful transmission layers when spatial multiplexing is used. In case of transmit diversity, rank is equal to 1.
No comments:
Post a Comment